The Me Too House / LADAA

first_imgArchDaily Year:  Architects: LADAA Area Area of this architecture project Photographs:  Courtesy of LADAA+ 41 Share Copy Year:  Houses ShareFacebookTwitterPinterestWhatsappMailOrhttps://www.archdaily.com/370836/the-me-too-house-ladaa Clipboard The Me Too House / LADAA “COPY” ShareFacebookTwitterPinterestWhatsappMailOrhttps://www.archdaily.com/370836/the-me-too-house-ladaa Clipboard “COPY” Photographs 2013 Save this picture!Courtesy of LADAA Save this picture!Courtesy of LADAARecommended ProductsPorcelain StonewareApariciPorcelain Tiles – JacquardCoffee tablesBoConceptMadrid Coffee Table AD23Panels / Prefabricated AssembliesULMA Architectural Solutions3D Facade Panel The building consists of four interconnected volumes each with a different height, thus reaching for the maximum integration with the topography of the surrounding area and a natural decomposition of the requirement program. Almost didactically the architecture tells us what is happening inside. At the same time the volumes are articulated to generate a large private garden open to the sun and the surrounding views. The whole house is built with load-bearing walls of gray concrete and steel columns. Outwardly the gray concrete, zinc panels and glass walls with anodized aluminum frames materializes the four volumes. Save this picture!Courtesy of LADAA With the decomposition of the requirement program into four volumes, we reached several objectives planed when analyzing the plot and its location. The first was to colonize the whole plot, making the area ours and eliminating any lost zones, the second was to search for a house with spatial continuity where the program wasn’t divided into stories as in a conventional building. For this we for opted for a spread-out at half-story intervals of the volumes, which in turn allow for adaptation to the natural slope of the area, something fundamental in the relationship with the exterior.  Save this picture!Courtesy of LADAAThe break with the traditional separation between inside and outside, which thanks to the local climate we can control to suit the user, according to their needs, with flexible and mobile closings. An important aspect was the idea of ​​humility. Outwardly we wanted to show the house as quiet and simple. And on the inside changing the scale, here showing it as extroverted, exaggerated and luxurious. Access to the house is through a two-story volume that opens to the north by a concrete canopy that serves as outside parking and to the south the views with the lobby and a library on the top floor. This part serves as the hinge between the Day area and the Night area. The bedrooms are located in a two-story volume, with the top floor for the parents and the ground floor for the children.  Save this picture!Courtesy of LADAAThe Day zones are divided into two volumes with one story each. One for the kitchen and the service area, and one for the living room. Inside, the transition between one volume and the next is solved with small steps, which solves the height difference the volumes present externally, in a natural way. Thereby enhancing the idea of ​​spatial continuity and facilitating the circulation of the users. As for the technological part, it’s noteworthy that thanks to a cross ventilation system we have been able to eliminate the artificial air conditioning normally in use during summer. The operation of this system is carried out by a system of sliding windows present throughout the house, some motorized and retractable with adjustable blinds.  Save this picture!Site PlanFor heating we have used a system of low temperature convectors embedded in the floor, always under and parallel to the large windows to reduce heat loss. As for the lighting system, the large windows are the main characters, which virtually disappear, incorporating the exterior into the interior space. For the artificial lighting a special ceiling piece has been designed, which serves to hide the curtains and generate linear lighting strips with LED’s, parallel to the windows empowering their presence in house and their character of glass walls.Project gallerySee allShow lessFarm Building Renovation / Loïc Picquet ArchitecteSelected ProjectsLibeskind Selected to Design Ohio Statehouse Holocaust MemorialArticles Share 2013 The Me Too House / LADAASave this projectSaveThe Me Too House / LADAASave this picture!Courtesy of LADAAHouses•Sagunto/Sagunt, Spain Projects Spain Area:  707 m² Area:  707 m² Year Completion year of this architecture project CopyAbout this officeLADAAOfficeFollowProductConcrete#TagsProjectsBuilt ProjectsSelected ProjectsResidential ArchitectureHousesSagunto/SaguntHousesSpainPublished on May 09, 2013Cite: “The Me Too House / LADAA” 09 May 2013. ArchDaily. Accessed 11 Jun 2021. ISSN 0719-8884Browse the CatalogSinkshansgroheBathroom Mixers – MetrisVinyl Walls3MVinyl Finish – DI-NOC™ EffectPartitionsSkyfoldIntegrating Operable Walls in a SpaceBricksEndicottBrick Facade at the Bruce Nesbitt African American Cultural CenterBathroom FurnitureBradley Corporation USAToilet Partition CubiclesSkylightsLAMILUXGlass Skylight F100 CircularLightsLouis PoulsenOutdoor Lighting – Flindt GardenRailing / BalustradesSolarluxBalcony Glazing – SL 60eUrban ShadingPunto DesignPublic Architecture in Residential ComplexDoorsLinvisibileLinvisibile Products in Palazzo VolpiChairshorgenglarusUpholstered Chair – diva 5-154Wall / Ceiling LightsHE WilliamsLED Downlight – 4DR RoundMore products »Save世界上最受欢迎的建筑网站现已推出你的母语版本!想浏览ArchDaily中国吗?是否翻译成中文现有为你所在地区特制的网站?想浏览ArchDaily中国吗?Take me there »✖You’ve started following your first account!Did you know?You’ll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.Go to my streamlast_img read more

9 Challengers will reach the CS:GO Legends Stage after 100 Thieves visa problems

first_imgLast week it was revealed that 100 Thieves Counter-Strike: Global Offensive team was unable to compete at the ELEAGUE Major: Boston due to issues with visas. Instead of drafting in a team to compete, ELEAGUE has now decided that a ninth team will qualify for the newly named Legends Stage from the Challengers Stage. The 100 Thieves roster that did not make it to Boston is comprised, in the bulk, of the Immortals roster previously involved in controversy resulting in their departure from the organisation.Vito “kNg” Giuseppe, Henrique “HEN1” TEles, Lucas “LUCAS1” Teles were joined following their Immortals departure by Lincoln “fnx” Lau and Bruno “BIT” Fukuda in mid-December, and as a result maintained their major spot due to having the majority of a previous legend roster. We are disappointed to share that due to immigration issues, the 100 Thieves CS:GO team will not be attending the upcoming Boston major. It goes without saying that this is devastating for the players and for us. We are truly sorry for them and their fans.— 100 Thieves (@100Thieves) January 13, 2018The organisation tweeted their apology to fans, and will be hoping that visa issues do not persist going into future tournaments. G2 and Cloud9 are the two organisations that have already cemented their place in the next stage of the major and will join the seven existing legends that remain. There’s still a whopping seven spots up for grabs so it’s all to play for in the coming days of qualification.FaZe, Natus Vincere, mousesports, Space Soldiers, Team Liquid and Vega Squadron are all just one win away from making the main event, whilst Quantum Bellator Fire, EnVyUs, Misfits, AVANGAR, Renegades and Sprout are all just one defeat away from complete elimination. Normally, teams that reach three wins will qualify for the next stage of the event but this time around one team that finishes 2-3 will qualify, too. The process for qualification is that the teams that finish 2-3 will be ranked further by looking at head-to-head results if possible, and ultimately a random draw.Esports Insider says: A random draw would draw some very interesting criticism from the community but given time constraints it could be all that’s available. Here’s hoping it doesn’t go down to the RNG of a coin flip, but you never know.last_img read more